EngineeringSeptember 18, 2026 · 6 min read
Why 130 kW Racks Change Datacenter Design
Liquid cooling is no longer optional. What direct-to-chip means for your power train, floor loading, and commissioning.
Read the articleEngineering notes and market guides from the team that designs and builds AI facilities.
Liquid cooling is no longer optional. What direct-to-chip means for your power train, floor loading, and commissioning.
Read the articleNeocloud B200 rate cards against a 5-year owned NVL72 rack: utilisation, power price and refresh cycle decide it.
Read the articleAnchor tenants get the gigawatts. How enterprises deploy 8–16 liquid-cooled racks in their own building, in one quarter.
Read the articleA GPU hall concentrates model weights, customer data and seven-figure hardware behind one door. What an AI datacenter security program covers, and where to start.
Read the article