A Private AI Factory, Engineered as One System and Handed Over as an Asset You Own.

Site, power, cooling, racks, fabric, compute and storage designed together for Blackwell Ultra and Vera Rubin generations — from a single liquid-cooled row to 64+ racks — delivered under one contract with one accountable engineering team.

NVL72 RACK ROW · LIQUID LOOPCDUSupply 25 °CReturn 45 °C72 GPUs / rack · 132 kW
1 → 64+
liquid-cooled racks per hall
132 kW
per GB300 NVL72 rack, direct-to-chip
13 wks
shell to first token on a modular build

Who This Is For

  • AI labs and model companies that have outgrown rented capacity and want a cluster they control
  • Enterprises standing up a private training or inference zone inside their own facility or a colo cage
  • Research institutions and universities funding a multi-year GPU asset rather than cloud credits
  • Investors and developers who need a powered shell turned into a leasable AI hall

What's Included

Workload-To-Rack Sizing

Training and inference profile translated into GPU count, memory, interconnect topology and storage bandwidth before any hardware is specified.

Facility Engineering

Electrical one-lines, mechanical schematics, slab loading (1,600 kg racks), containment and pathway — stamped drawings ready for permit.

Rack and Fabric Design

NVL72 or HGX rack configurations, rail-optimised InfiniBand or Spectrum-X fabric, 800G optics plan, GPUDirect storage network.

Procurement at Partner Pricing

Allocation and lead-time management across NVIDIA, Supermicro, Dell, Vertiv, CoolIT, Arista and distribution — one bill of materials, one PO to us.

Installation and Integration

Rack-and-stack, liquid loop fill and leak test, structured cabling certified to 800G, power commissioning and thermal mapping.

Bring-Up and Handover

Burn-in, fabric tuning, scheduler and observability stack, documentation and operator training. Optional transition into our managed NOC.

Reference Specifications

Starting points. Every engagement is engineered to the workload, site and budget in front of us.

ComputeNVIDIA GB300 NVL72 (72 GPUs / rack), HGX B300 8-GPU nodes, Vera Rubin NVL144-ready; AMD MI355X on request
Rack densityUp to 140 kW per rack; direct-to-chip cold plates with row CDUs, rear-door HX for 40–60 kW air-adjacent rows
Power415 V 3-phase to 33 kW+ OCP power shelves per rack, N+1 or 2N UPS, 800 VDC-ready overhead busway
FabricQuantum-X800 InfiniBand or Spectrum-X Ethernet, rail-optimised two-tier topology, 1.6T-ready optics and trunks
StorageVAST, WEKA or DDN parallel filesystem sized to checkpoint cadence; NVMe tier with GPUDirect Storage
SoftwareKubernetes or Slurm, NVIDIA Mission Control, Prometheus/Grafana, DCIM integration to breaker level
DeliverablesStamped drawings, BOM with serials, commissioning reports, as-builts, runbooks

How We Deliver

  1. 1

    Discovery and Sizing

    Weeks 1–2

    Workload interviews, site survey, utility and cooling capacity review. Output: sized design basis and budgetary estimate.

  2. 2

    Engineering

    Weeks 3–6

    Electrical, mechanical, structural and network design packages. Long-lead procurement starts in parallel.

  3. 3

    Build and Install

    Weeks 6–12

    Facility fit-out, CDU and busway installation, rack delivery and integration, cabling certification.

  4. 4

    Commission and Hand Over

    Weeks 12–14

    L1–L5 commissioning, burn-in, fabric and storage tuning, documentation, operator training.

Questions We Get Asked

Can you build inside a colocation cage rather than our own building?

Yes. Most medium deployments land in a colo cage. We handle the landlord engineering review, slab and power confirmation, and the liquid-loop interface with the facility's chilled-water plant.

How do you handle GPU allocation and lead times?

We place orders through partner programs and distribution with allocation visibility, and we design the schedule around confirmed ship dates. Where allocation is tight we propose a phased rack delivery so the facility work is never waiting on silicon.

Do we have to use your managed operations afterwards?

No. Handover includes everything your team needs to operate the cluster. Managed NOC is a separate, optional engagement.

Request a Quotation

Pre-tagged as AI factory design & build. A solutions engineer responds the same business day.