Inference Capacity Where the Users Are — Prefabricated, Shipped and Commissioned as a Unit.

Factory-built modules with GPU or LPU inference nodes, integrated power and liquid cooling, delivered to metro edge sites, parking structures, campuses and industrial yards. Engineered once, repeated as many times as demand requires.

PREFAB INFERENCE MODULE · 250 KWPOWERUPS · PDUCDU4 racks · 40 ft ISO12.2 mFactory-tested · live in 16 weeks
250 kW+
per module, scalable in blocks
8–12 wks
from order to energised on a prepared pad
< 5 ms
metro latency to users and data sources

Who This Is For

  • Model and application companies that need low-latency inference in specific metros
  • Telecom and real-estate operators monetising sites with power and fiber
  • Enterprises placing inference next to data that cannot move — plants, hospitals, campuses
  • Teams that need capacity in weeks and cannot wait for a hall fit-out

What's Included

Module Selection and Engineering

Vertiv MegaMod and Schneider-class prefabricated enclosures sized to the node count, with integrated cooling and power.

Inference Node Configuration

GPU nodes (L40S, B200/B300, HGX) or LPU and ASIC inference platforms chosen for the model mix and latency targets.

Site Preparation

Pad, utility connection, fiber entry, security fencing and permitting at each location.

Integration and Shipping

Racks, fabric, storage and cooling installed and tested at the factory; module shipped as a sealed unit.

Commissioning

On-site power and cooling commissioning, network turn-up, burn-in and handover to your platform team.

Fleet Operations

Remote monitoring and smart hands for distributed sites under our managed NOC, if required.

Reference Specifications

Starting points. Every engagement is engineered to the workload, site and budget in front of us.

Module capacity250 kW to 1 MW IT load per module; multiple modules per site
ComputeNVIDIA L40S / B200 / B300 nodes, HGX systems, or LPU/ASIC inference platforms
CoolingIntegrated in-row or liquid cooling with external dry coolers; rear-door HX for air-adjacent nodes
PowerUtility feed with integrated UPS and optional generator; 415 V distribution to racks
ConnectivityDual fiber entry, 100/400G uplinks, private interconnect to cloud regions where needed
SecurityAccess control, CCTV and intrusion detection integrated to the NOC

How We Deliver

  1. 1

    Site and Demand Model

    Weeks 1–2

    Where the users and data are, latency targets, node count per site, power and fiber availability.

  2. 2

    Engineering and Order

    Weeks 2–4

    Module configuration, site civil design, permitting, equipment orders.

  3. 3

    Factory Build

    Weeks 4–10

    Enclosure fit-out, rack integration, testing at the factory while the pad is prepared.

  4. 4

    Ship and Commission

    Weeks 10–12

    Delivery, placement, utility and fiber tie-in, commissioning and handover.

Questions We Get Asked

How is this different from a shipping-container datacenter?

Purpose-built prefabricated modules carry proper fire suppression, cooling, power and serviceability designed for GPU density. Repurposed containers rarely meet those requirements or local code.

Can modules be moved later?

Yes. The module is a sealed unit; with a prepared pad and connections at the new site it can be relocated and recommissioned.

Who operates a fleet of distributed sites?

Your platform team, or our NOC. We design every module with remote monitoring and out-of-band access so distributed operations do not require staff on site.